Friday 4 March 2016

Timeline and Health and Saftey

11th March (Friday): 7.00pm meet up to film on a train at Waterloo, trains are stationary there for a while and we will avoid huge costs of time and money.
12th March (Saturday): 7.00pm same plan incase we don't get all our filming done. 
15th March (Tuesday): edit what has been filmed, do the cutting and ordering of the filming (look at story board for reference).
16th March (Wednesday): edit during break and lunch, do transitions and maybe fix lightings and other factors that maybe be affecting the film.
17th March (Thursday):carry on the editing process. 
18th March (Friday):  finish off with the credits and other texts like the title, try and add a cool effect such as the letters entering one by one as a train goes past.

IF WE FILM OVER TWO DAYS:
  • use the same actor
  • same outfits
  • near same carriage and location should be almost exact
EQUIPMENT:
  • tripod and camera
  • same outfits
  • lighting 
  • microphones

HEALTH AND SAFETY:
  • mind the gap between the train and the platform
  • weird people at night, stay together
  • make sure someones with equipment at all time so that it is not stolen
WHO IS DOING WHAT?:
  • Arthur - Playing the bad guy, should dress in all black helping with filming and lighting
  • Aaron- Filming and lighting
  • Emily -Playing The Girlfriend, also helping with some filming and lighting
  • Eryk- Playing The Boyfriend- also helping with doing filming and lighting

No comments:

Post a Comment